{"id":747,"date":"2025-06-23T09:00:26","date_gmt":"2025-06-23T07:00:26","guid":{"rendered":"https:\/\/grandrenovation.nl\/?p=747"},"modified":"2026-03-13T15:45:11","modified_gmt":"2026-03-13T14:45:11","slug":"de-ultieme-gids-voor-renovatiekosten-in-nederland-2025","status":"publish","type":"post","link":"https:\/\/grandrenovation.nl\/nl\/de-ultieme-gids-voor-renovatiekosten-in-nederland-2025\/","title":{"rendered":"De ultieme gids voor renovatiekosten in Nederland 2026"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":748,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"rank_math_title":"Home Renovation Cost Netherlands 2026 | Full Price Guide","rank_math_description":"What does a home renovation cost in the Netherlands? Prices per m\u00b2 for bathroom, kitchen, full house &amp; extensions in 2026. Free quote from Grand Renovation.","rank_math_focus_keyword":"home renovation cost Netherlands,house renovation cost,renovation costs 2025,renovation cost per square meter,GrandRenovation","footnotes":""},"categories":[1],"tags":[],"class_list":["post-747","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-1"],"acf":{"banner":748,"post":{"editor":"<strong>Planning a home renovation in the Netherlands?<\/strong> Whether you're refreshing a single bathroom or undertaking a complete house overhaul, understanding real costs is the first step to a successful project. This guide covers actual price ranges for every major renovation type in the Netherlands in 2026 \u2014 from a basic kitchen update to a full turnkey transformation.\r\n<h2>Quick Overview: Renovation Costs at a Glance<\/h2>\r\n<table>\r\n<thead>\r\n<tr>\r\n<th>Renovation Type<\/th>\r\n<th>Basic<\/th>\r\n<th>Mid-Range<\/th>\r\n<th>Luxury<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td><strong>Bathroom renovation<\/strong><\/td>\r\n<td>\u20ac3,000 \u2013 \u20ac6,000<\/td>\r\n<td>\u20ac6,000 \u2013 \u20ac12,000<\/td>\r\n<td>\u20ac12,000 \u2013 \u20ac25,000+<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Kitchen renovation<\/strong><\/td>\r\n<td>\u20ac5,000 \u2013 \u20ac10,000<\/td>\r\n<td>\u20ac10,000 \u2013 \u20ac20,000<\/td>\r\n<td>\u20ac20,000 \u2013 \u20ac50,000+<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Full home renovation<\/strong><\/td>\r\n<td>\u20ac500 \u2013 \u20ac800\/m\u00b2<\/td>\r\n<td>\u20ac800 \u2013 \u20ac1,200\/m\u00b2<\/td>\r\n<td>\u20ac1,200 \u2013 \u20ac2,000+\/m\u00b2<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>House extension (aanbouw)<\/strong><\/td>\r\n<td>\u20ac1,500 \u2013 \u20ac2,000\/m\u00b2<\/td>\r\n<td>\u20ac2,000 \u2013 \u20ac2,800\/m\u00b2<\/td>\r\n<td>\u20ac2,800 \u2013 \u20ac4,000+\/m\u00b2<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Attic conversion (zolder)<\/strong><\/td>\r\n<td>\u20ac15,000 \u2013 \u20ac25,000<\/td>\r\n<td>\u20ac25,000 \u2013 \u20ac45,000<\/td>\r\n<td>\u20ac45,000 \u2013 \u20ac70,000+<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Painting (interior)<\/strong><\/td>\r\n<td>\u20ac8 \u2013 \u20ac12\/m\u00b2<\/td>\r\n<td>\u20ac12 \u2013 \u20ac18\/m\u00b2<\/td>\r\n<td>\u20ac18 \u2013 \u20ac30\/m\u00b2<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Plastering \/ stucco<\/strong><\/td>\r\n<td>\u20ac12 \u2013 \u20ac18\/m\u00b2<\/td>\r\n<td>\u20ac18 \u2013 \u20ac25\/m\u00b2<\/td>\r\n<td>\u20ac25 \u2013 \u20ac40\/m\u00b2<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Floor installation<\/strong><\/td>\r\n<td>\u20ac25 \u2013 \u20ac45\/m\u00b2<\/td>\r\n<td>\u20ac45 \u2013 \u20ac80\/m\u00b2<\/td>\r\n<td>\u20ac80 \u2013 \u20ac180+\/m\u00b2<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Electrical rewiring<\/strong><\/td>\r\n<td>\u20ac3,000 \u2013 \u20ac6,000<\/td>\r\n<td>\u20ac6,000 \u2013 \u20ac12,000<\/td>\r\n<td>\u20ac12,000 \u2013 \u20ac20,000+<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Underfloor heating<\/strong><\/td>\r\n<td>\u20ac50 \u2013 \u20ac80\/m\u00b2<\/td>\r\n<td>\u20ac80 \u2013 \u20ac120\/m\u00b2<\/td>\r\n<td>\u20ac120 \u2013 \u20ac200\/m\u00b2<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<em>All prices include labour and standard materials, VAT (BTW) included. Prices are indicative \u2014 final cost depends on condition of the existing structure, chosen materials, and location.<\/em>\r\n<h2>Bathroom Renovation Costs in the Netherlands<\/h2>\r\nThe bathroom is consistently one of the highest-return renovation investments in Dutch homes. A well-executed bathroom renovation adds significant value to your property and improves daily comfort immediately.\r\n<table>\r\n<thead>\r\n<tr>\r\n<th>Scope<\/th>\r\n<th>What's Included<\/th>\r\n<th>Typical Cost<\/th>\r\n<th>Timeline<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td><strong>Cosmetic refresh<\/strong><\/td>\r\n<td>New toilet, tap, paint, accessories \u2014 no tiling<\/td>\r\n<td>\u20ac1,500 \u2013 \u20ac3,000<\/td>\r\n<td>2\u20133 days<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Basic renovation<\/strong><\/td>\r\n<td>New tiles, toilet, sink, shower or bath, plumbing connections<\/td>\r\n<td>\u20ac3,000 \u2013 \u20ac6,000<\/td>\r\n<td>1 week<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Full renovation<\/strong><\/td>\r\n<td>Complete strip-out, new tiling, fixtures, plumbing, electrics, lighting<\/td>\r\n<td>\u20ac6,000 \u2013 \u20ac12,000<\/td>\r\n<td>1.5 \u2013 2.5 weeks<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Luxury \/ custom<\/strong><\/td>\r\n<td>Walk-in shower, freestanding bath, premium tiles, underfloor heating, custom vanity<\/td>\r\n<td>\u20ac12,000 \u2013 \u20ac25,000+<\/td>\r\n<td>3 \u2013 5 weeks<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<strong>Key cost factors for bathroom renovation:<\/strong>\r\n<ul>\r\n \t<li>Tile format and brand \u2014 large-format porcelain (e.g. 120\u00d760 cm) costs more to purchase and install than standard 30\u00d730 ceramic<\/li>\r\n \t<li>Layout changes \u2014 moving the toilet or shower drain requires rerouting pipes and significantly increases cost<\/li>\r\n \t<li>Wet room vs shower tray \u2014 a fully tiled wet room requires more waterproofing and skilled labour<\/li>\r\n \t<li>Underfloor heating adds \u20ac500\u2013\u20ac1,200 depending on bathroom size<\/li>\r\n<\/ul>\r\n<h2>Kitchen Renovation Costs in the Netherlands<\/h2>\r\nKitchen renovations have the widest cost range of any single room \u2014 driven largely by the kitchen unit brand, worktop material, and appliances you choose. Labour typically accounts for 30\u201340% of the total budget.\r\n<table>\r\n<thead>\r\n<tr>\r\n<th>Scope<\/th>\r\n<th>What's Included<\/th>\r\n<th>Typical Cost<\/th>\r\n<th>Timeline<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td><strong>Kitchen refresh<\/strong><\/td>\r\n<td>New doors\/fronts on existing carcasses, new worktop, tap<\/td>\r\n<td>\u20ac2,000 \u2013 \u20ac5,000<\/td>\r\n<td>1\u20133 days<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Mid-range renovation<\/strong><\/td>\r\n<td>New kitchen unit (IKEA\/H\u00e4cker level), worktop, sink, appliances, tiling, new plumbing<\/td>\r\n<td>\u20ac8,000 \u2013 \u20ac18,000<\/td>\r\n<td>1 \u2013 2 weeks<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Full renovation with layout change<\/strong><\/td>\r\n<td>Wall removal, new electrics, full plumbing relocation, premium units<\/td>\r\n<td>\u20ac18,000 \u2013 \u20ac35,000<\/td>\r\n<td>3 \u2013 5 weeks<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Luxury \/ bespoke<\/strong><\/td>\r\n<td>Custom cabinetry, natural stone worktops (marble\/granite), integrated appliances<\/td>\r\n<td>\u20ac35,000 \u2013 \u20ac80,000+<\/td>\r\n<td>6 \u2013 12 weeks<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h2>Full Home Renovation Costs per m\u00b2<\/h2>\r\nFor a complete home renovation \u2014 covering all rooms, all finishes, and all technical systems \u2014 Dutch contractors typically price per square metre of living space. Here is what to expect at each level:\r\n<table>\r\n<thead>\r\n<tr>\r\n<th>Level<\/th>\r\n<th>Price per m\u00b2<\/th>\r\n<th>What's Typical<\/th>\r\n<th>Example: 80m\u00b2 home<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td><strong>Basic (functioneel)<\/strong><\/td>\r\n<td>\u20ac500 \u2013 \u20ac800\/m\u00b2<\/td>\r\n<td>Standard materials, no layout changes, functional finish<\/td>\r\n<td>\u20ac40,000 \u2013 \u20ac64,000<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Mid-range (comfortabel)<\/strong><\/td>\r\n<td>\u20ac800 \u2013 \u20ac1,200\/m\u00b2<\/td>\r\n<td>Quality materials, some layout work, modern finish<\/td>\r\n<td>\u20ac64,000 \u2013 \u20ac96,000<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>High-end (luxe)<\/strong><\/td>\r\n<td>\u20ac1,200 \u2013 \u20ac2,000+\/m\u00b2<\/td>\r\n<td>Premium materials, full design input, bespoke finishes<\/td>\r\n<td>\u20ac96,000 \u2013 \u20ac160,000+<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<strong>What a full home renovation typically includes:<\/strong>\r\n<ul>\r\n \t<li>Demolition and waste removal<\/li>\r\n \t<li>New plumbing throughout (pipes, radiators, connections)<\/li>\r\n \t<li>Full electrical rewiring to NEN 1010 standard<\/li>\r\n \t<li>Insulation (walls, roof, floor) if required<\/li>\r\n \t<li>Plastering and stucco on all walls and ceilings<\/li>\r\n \t<li>Floor installation throughout<\/li>\r\n \t<li>Complete bathroom and kitchen renovation<\/li>\r\n \t<li>Interior painting<\/li>\r\n \t<li>New interior doors and skirtings<\/li>\r\n<\/ul>\r\n<h2>House Extension (Aanbouw) Costs<\/h2>\r\nAdding extra square metres to your home is one of the most cost-effective ways to increase both living space and property value in the Netherlands. Extensions typically require a building permit (<em>omgevingsvergunning<\/em>) from your municipality.\r\n<table>\r\n<thead>\r\n<tr>\r\n<th>Extension Type<\/th>\r\n<th>Price Range per m\u00b2<\/th>\r\n<th>Notes<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td><strong>Ground floor rear extension<\/strong><\/td>\r\n<td>\u20ac1,800 \u2013 \u20ac2,800\/m\u00b2<\/td>\r\n<td>Most common type in Dutch terraced houses<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Side extension<\/strong><\/td>\r\n<td>\u20ac2,000 \u2013 \u20ac3,200\/m\u00b2<\/td>\r\n<td>Requires more structural work, often higher planning complexity<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Dormer (dakkapel)<\/strong><\/td>\r\n<td>\u20ac15,000 \u2013 \u20ac35,000 total<\/td>\r\n<td>Fixed price \u2014 width determines cost more than m\u00b2<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Full second storey addition<\/strong><\/td>\r\n<td>\u20ac1,500 \u2013 \u20ac2,500\/m\u00b2<\/td>\r\n<td>Complex structural work required, 8\u201316 week project<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h2>Labour Rates in the Netherlands (2026)<\/h2>\r\nUnderstanding hourly trade rates helps you evaluate quotes and plan for unexpected work during a renovation.\r\n<table>\r\n<thead>\r\n<tr>\r\n<th>Trade<\/th>\r\n<th>Hourly Rate (incl. VAT)<\/th>\r\n<th>Notes<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>General contractor \/ timmerman<\/td>\r\n<td>\u20ac55 \u2013 \u20ac85\/hr<\/td>\r\n<td>Standard rate for carpentry, assembly, general work<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Electrician (elektricien)<\/td>\r\n<td>\u20ac65 \u2013 \u20ac95\/hr<\/td>\r\n<td>Higher for NEN 1010 certified work<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Plumber (loodgieter)<\/td>\r\n<td>\u20ac60 \u2013 \u20ac90\/hr<\/td>\r\n<td>Emergency rates can be 1.5\u20132\u00d7 higher<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Tiler (tegelzetter)<\/td>\r\n<td>\u20ac50 \u2013 \u20ac75\/hr<\/td>\r\n<td>Large-format tiles command premium rates<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Plasterer (stukadoor)<\/td>\r\n<td>\u20ac45 \u2013 \u20ac70\/hr<\/td>\r\n<td>Fine plaster finish is slower and costs more<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Painter (schilder)<\/td>\r\n<td>\u20ac40 \u2013 \u20ac65\/hr<\/td>\r\n<td>Exterior painting typically higher than interior<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h2>Does Location Affect Renovation Costs in the Netherlands?<\/h2>\r\nYes \u2014 significantly. Amsterdam and other major cities typically carry a 15\u201325% premium on renovation costs compared to rural provinces, due to higher labour costs, parking and logistics challenges, and VvE requirements in apartment buildings.\r\n<table>\r\n<thead>\r\n<tr>\r\n<th>Region<\/th>\r\n<th>Cost Index vs National Average<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>Amsterdam<\/td>\r\n<td>+15% \u2013 +25%<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Rotterdam, Den Haag, Utrecht<\/td>\r\n<td>+5% \u2013 +15%<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Eindhoven, Hilversum, Haarlem<\/td>\r\n<td>+0% \u2013 +8%<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Smaller cities and rural provinces<\/td>\r\n<td>\u20135% \u2013 \u201310%<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h2>5 Factors That Most Affect Your Renovation Budget<\/h2>\r\n<strong>1. Condition of the existing structure.<\/strong> Pre-war Dutch homes (built before 1940) frequently have outdated wiring, lead pipes, poor insulation, and unexpected structural issues. Budget 10\u201315% contingency for older properties.\r\n\r\n<strong>2. Material choices.<\/strong> The difference between standard and premium materials can double or triple the total budget. A ceramic tile at \u20ac15\/m\u00b2 vs a natural stone at \u20ac120\/m\u00b2 \u2014 the labour to install is similar, but material cost is 8\u00d7 higher.\r\n\r\n<strong>3. Layout changes.<\/strong> Keeping your existing layout (plumbing, walls, electrics in the same position) dramatically reduces cost. Moving a kitchen or bathroom to a different location can add \u20ac5,000\u2013\u20ac15,000 just in pipe and cable rerouting.\r\n\r\n<strong>4. Turnkey vs self-managed.<\/strong> A turnkey renovation where one contractor manages all trades typically costs 10\u201315% more than managing subcontractors yourself \u2014 but saves weeks of coordination, reduces errors, and comes with a single warranty.\r\n\r\n<strong>5. Permit requirements.<\/strong> Structural changes, extensions, and work in historic buildings require an <em>omgevingsvergunning<\/em> (environmental permit). This adds 4\u201312 weeks to the timeline and \u20ac500\u2013\u20ac2,000 in application costs. VvE buildings (apartments) also require written approval from the homeowners' association.\r\n<h2>How to Get an Accurate Quote<\/h2>\r\nGetting meaningful renovation quotes requires preparation. Here is what to do before calling contractors:\r\n<ul>\r\n \t<li>Write down every room you want to renovate and the scope of work in each<\/li>\r\n \t<li>Decide on your finish level (basic, mid-range, or luxury) before the site visit<\/li>\r\n \t<li>Have approximate measurements ready (floor area of each room in m\u00b2)<\/li>\r\n \t<li>Know whether you want to supply your own materials or have the contractor source them<\/li>\r\n \t<li>Ask for an itemised quote \u2014 labour and materials listed separately<\/li>\r\n \t<li>Request a fixed price (vaste prijs) rather than an hourly estimate for predictable budgeting<\/li>\r\n<\/ul>\r\nAt Grand Renovation, we visit your property, assess the scope, and deliver a detailed fixed quote within a few days \u2014 at no cost and with no obligation. We have completed over 200 renovation projects across the Netherlands.\r\n<p style=\"text-align: center;\"><a href=\"#main-form\"><strong>Request a Free Quote for Your Renovation<\/strong><\/a><\/p>\r\n\r\n<h2>Frequently Asked Questions about Renovation Costs in the Netherlands<\/h2>\r\n<h3>How much does it cost to renovate a house in the Netherlands?<\/h3>\r\nA full home renovation in the Netherlands typically costs between \u20ac500 and \u20ac2,000 per m\u00b2 depending on finish level. For an 80m\u00b2 home, expect \u20ac40,000\u2013\u20ac160,000 for a complete renovation including bathroom, kitchen, electrics, plumbing, flooring, and plastering.\r\n<h3>Do renovation prices include VAT (BTW) in the Netherlands?<\/h3>\r\nRenovation work on existing homes is subject to 9% BTW (reduced rate) when the home is older than 2 years. New construction carries 21% BTW. Always confirm with your contractor whether the quoted price is inclusive or exclusive of VAT.\r\n<h3>How long does a full home renovation take in the Netherlands?<\/h3>\r\nA complete home renovation typically takes 8\u201320 weeks depending on scope. A single room (bathroom or kitchen) takes 1\u20134 weeks. Full house renovations with structural changes, permits, and custom finishes can take 4\u20136 months.\r\n<h3>Do I need a permit (vergunning) for my renovation?<\/h3>\r\nInterior renovations (tiling, plastering, painting, replacing fixtures) generally do not require a permit. Structural changes, extensions, removing load-bearing walls, and changes to the exterior typically do require an <em>omgevingsvergunning<\/em> from your municipality. Apartment owners often also need VvE approval.\r\n<h3>What is a realistic contingency budget for a renovation?<\/h3>\r\nFor homes built after 1980: budget 10% contingency. For older homes (pre-1960): budget 15\u201320% for unexpected discoveries such as asbestos, outdated wiring, or structural issues behind walls. This buffer prevents budget overruns mid-project.\r\n<h3>Is it cheaper to renovate or move house in the Netherlands?<\/h3>\r\nWith Dutch property transfer tax (<em>overdrachtsbelasting<\/em>) at 2% for owner-occupiers plus agent fees and moving costs, moving a typical Dutch home costs \u20ac15,000\u2013\u20ac30,000 before any work on the new property. In most cases, a targeted renovation of your current home is significantly more cost-effective than moving.\r\n<p style=\"text-align: center;\"><a href=\"#main-form\"><strong>Get a Free, No-Obligation Renovation Quote<\/strong><\/a><\/p>"},"author":{"photo":"","name":"","signature":"","description":""},"quote":{"quote":"","name":"","signature":""},"photo_field":""},"_links":{"self":[{"href":"https:\/\/grandrenovation.nl\/nl\/wp-json\/wp\/v2\/posts\/747","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/grandrenovation.nl\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/grandrenovation.nl\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/grandrenovation.nl\/nl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/grandrenovation.nl\/nl\/wp-json\/wp\/v2\/comments?post=747"}],"version-history":[{"count":5,"href":"https:\/\/grandrenovation.nl\/nl\/wp-json\/wp\/v2\/posts\/747\/revisions"}],"predecessor-version":[{"id":1794,"href":"https:\/\/grandrenovation.nl\/nl\/wp-json\/wp\/v2\/posts\/747\/revisions\/1794"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/grandrenovation.nl\/nl\/wp-json\/wp\/v2\/media\/748"}],"wp:attachment":[{"href":"https:\/\/grandrenovation.nl\/nl\/wp-json\/wp\/v2\/media?parent=747"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/grandrenovation.nl\/nl\/wp-json\/wp\/v2\/categories?post=747"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/grandrenovation.nl\/nl\/wp-json\/wp\/v2\/tags?post=747"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}