Plumbing is the part of a renovation that is easiest to get wrong and most expensive to fix later. At Grand Renovation we handle the plumbing for full bathroom, kitchen, toilet and whole-home renovations across the Netherlands – water supply lines, waste and drainage, fixtures, and appliance connections – as part of one fixed-price project, with our own team and no subcontractors.
This is planned renovation and installation work, not an emergency call-out service. We design the pipe runs, install and connect everything, and test the system before tiling and finishing close the walls. Because the same team manages plumbing, tiling and electrical work, there are no scheduling gaps between trades and no finger-pointing when something needs to align.
Every renovation has a different scope, but plumbing work usually includes:
Plumbing rarely happens in isolation. It connects directly to our tiling, plastering and electrical work, which is why we keep all of it in-house.
Renovation plumbing happens in two stages. The first fix is the pipework installed before walls and floors are closed – supply lines, drainage, and connection points roughed in to the right positions. The second fix is everything visible: taps, toilets, basins and appliances connected and tested once tiling is complete.
The order matters. Pipework set in the wrong place during the first fix is expensive to correct after tiling, so the layout has to be right before a single tile is laid. This is the single biggest reason to use one coordinated team rather than separate trades booked independently – the plumber, tiler and electrician work to the same plan and the same schedule.
Within a bathroom, kitchen or whole-home renovation, plumbing is included in one itemized, fixed-price quotation after a site visit – the price on the quote is the price on the invoice. For standalone installation work, the following ranges give an indication:
| Installation work | Indicative cost (incl. VAT) |
| Installing a new tap (kitchen or bathroom) | €100 – €200 |
| Installing a toilet (incl. removal of old unit) | €200 – €400 |
| Installing / connecting a washbasin | €100 – €200 |
| Repositioning pipework (per run) | from €300 |
Within a renovation, plumbing cost is driven mainly by whether pipe positions change. Keeping the existing layout is the largest single saving; moving a toilet or adding a basin where none existed means new drainage runs and additional labour.
Bathroom plumbing
A bathroom renovation is the most plumbing-intensive room in the house: supply and waste for the toilet, basin, shower and bath, often with a new layout. We rough in all connections during the first fix, then install and test the fixtures once tiling is done. See our full bathroom renovation service for combined projects.
Kitchen plumbing and appliance connections
Kitchen plumbing covers the sink, mixer tap, dishwasher and washing-machine connections, and boiling-water taps. When a kitchen layout changes, supply and waste lines are rerouted to the new positions before units go in.
Repositioning and replacing pipework
Older Dutch homes often have outdated supply pipes or drainage that no longer meets the new layout. During renovation we inspect the existing pipework and replace or reroute only what is necessary – and we report honestly when existing pipes are sound and do not need replacing.
Radiators, heating and gas connections
Where a renovation changes a room, radiators are often moved or replaced, and kitchen or heating gas connections may need adjusting. We handle radiator relocation and gas connections as part of the renovation scope, with all gas work carried out by certified technicians to current safety standards.
For renovation plumbing, the work is hidden inside walls and floors, so the contractor you choose matters more than the fixtures you buy. When comparing options, look for:
Grand Renovation is KvK-registered (94089590), holds a 5.0/5 Google rating, works exclusively on fixed-price contracts, and keeps every trade in-house. You deal with one team and one quotation from first fix to final test.
How to Save on Renovation Plumbing
Most of our plumbing work happens inside a larger renovation. Combining rooms has clear advantages: one disruption period, shared pipe runs, and a lower combined cost than separate contracts. A recent combined project in Utrecht – bathroom, toilet and upper floor – ran 40 days at €55,000, including new plumbing throughout.
We deliver renovation plumbing across the Netherlands, as part of larger renovation projects.
We also work in The Hague, Eindhoven, Haarlem, Leiden, Almere, Zaandam and across the Randstad. Contact us to confirm availability.
Do you offer emergency or 24/7 plumbing?
No. Grand Renovation provides planned renovation and installation plumbing – new bathrooms, kitchens, fixtures and pipework – not emergency call-outs. If you are mid-renovation with us, your project team is your direct point of contact.
Is plumbing included in a bathroom or kitchen renovation quote?
Yes. Plumbing is part of the single fixed-price quotation for the renovation, alongside tiling, electrical and finishing work. You receive one itemized quote after a free site visit, valid as the final invoice.
Do I need to hire a separate plumber, tiler and electrician?
No. We keep all trades in-house and coordinate them to one schedule. This avoids the scheduling gaps and cost overruns that come from booking separate tradespeople for work that must happen in sequence.
Can you reuse my existing pipework?
Often, yes. During the renovation we inspect the existing supply and waste pipes. If they are sound and fit the new layout, we keep them; we only replace or reroute what is necessary, and we tell you which it is.
Can you install a boiling-water tap like a Quooker?
Yes. Boiling-water taps need both a water connection and an electrical supply, which our plumbing and electrical teams install together as part of a kitchen renovation.